What is the Mandurah Netball, Tennis and Multi-use Facility?

    The Mandurah Netball, Tennis and Multi-use Community Facility is a new sporting and community hub.

    The proposed concept design, which is subject to funding, includes 10 dedicated netball courts, six dedicated tennis courts, six multi-use courts and a 1,000 square metre community pavilion with modern and accessible spaces.

    The concept design sets the overall direction for the facility, with the finer details to be worked through during detailed design. The final design will need to fit within the State Government and City funding. If costs are higher than the project budget, some parts of the design may need to change.

    Why is the new facility needed?

    Mandurah currently has a shortage of quality outdoor netball courts and facilities for hire, with existing courts operating at capacity on a Saturday.

    The new facility will provide additional capacity, improve access to sport and support participation growth across the community.

    Where will the facility be located?

    The facility is planned for Education Drive in Greenfields, next to the South Metropolitan TAFE campus and John Tonkin College MET Campus.

    Who has been involved in developing the concept design?

    The City has carried out targeted engagement with:

    • Netball representatives
    • Tennis representatives
    • Current players and facility users
    • State sporting associations
    • The City's Youth Advisory Group
    • The City's Access and Inclusion Advisory Group

    Their feedback helped shape the design by highlighting how the facilities are used, what the community needs, and what should be considered as the design develops.

    We are now doing further engagement with local residents and environmental groups, including the City's Mandurah Environmental Advisory Group, before we progress to detailed design.

    When will construction begin?

    Construction is expected to begin in early 2028.

    These timeframes may change as the project progresses through design and other project stages.

    When is the facility expected to open?

    Construction is expected to finish in 2029.

    Project timeframes are indicative and may change as the project progresses.

    Who will be able to use the facility?

    The facility will be available for hire by the whole community, including local residents, sporting clubs, schools, community groups and social players.

    It will support a wide range of sporting and community uses, from organised sport and programs to functions.

    What sports will the facility support?

    The facility will have dedicated courts for netball and tennis, as well as six multi-use courts.

    While the facility will primarily cater for netball and tennis and the inclusion of multi-use courts will provide flexibility for a variety of sports and recreational activities. The pavilion will also provide opportunities for community programs and events.

    How can I stay up to date?

    Information about the project can be found on the City’s Mandurah Matters website.

    You can sign up to our mail list for updates about this project.

    Can I give feedback on the project?

    The City has already undertaken targeted engagement on the concept design with relevant stakeholders. The project is now moving straight into detailed design, so there will not be a wider community consultation process.

    However, nearby residents who may be affected by the project can contact the City’s Project Manager at any time with questions or feedback.

    Traffic related to the future operation of the facility is outside the scope of this project, which is specifically focused on the design and construction of the facility. However, traffic impacts will be considered through traffic assessments and traffic counts when planning for the facility’s operation.

    The detailed design will ensure the facility meets relevant Australian Standards for light spill. Noise from the future use of the facility will be managed through the facility’s hire terms and conditions.

    How will the construction of this facility affect the environment?

    The facility will be designed to minimise its impact on the environment and follow contemporary sustainability principles. This includes energy and water efficiency, natural ventilation and water-sensitive stormwater design. Solar panels and battery storage will also be investigated during detailed design. 

    Existing mature trees will be retained where possible, with setbacks included to help protect remaining native vegetation. Earthworks will be kept to a minimum, and native, waterwise plants will be used in landscaping. 

    Noise and lighting impacts on nearby residents and local wildlife will also be assessed as the design develops, along with any site contamination that needs to be managed.  

    Will the noise and lighting from the new facility disrupt nearby residents and local wildlife?

    Potential impacts on nearby residents and local wildlife will be considered as the design is developed. Noise modelling will look at activity from the courts, including crowds, whistles and the PA system, and help identify ways to minimise disruption. 

    Lighting will be designed to minimise impacts on nearby homes and surrounding habitat. This will include considering the type and level of lighting, where lights are positioned and directed, and the times that lighting is used. Any measures needed to reduce noise or light impacts will be considered as part of the detailed design. 

    Will the new facility have an impact on traffic in the area?

    The new facility will bring more people to the area, particularly during competitions and other busy periods. 

    A detailed traffic assessment will be undertaken to understand the potential impacts. It will look at access to and from the facility, current and expected traffic levels, peak times and impacts on surrounding streets. 

    Peak use of the facility is expected to be in the evenings and on weekends, rather than during school drop-off and pick-up times. The assessment will identify whether any changes or measures are needed to help manage traffic impacts.


    Will there be an impact on parking on Education Drive?

    Yes. The current concept design will reduce the number of existing parking bays on Education Drive. This reflects the amount of space needed to deliver the courts required to meet growing demand for sport in Mandurah. 

    As the project moves into detailed design, opportunities to minimise the loss of parking bays will be explored. Peak use of the facility is expected to be in the evenings and on weekends, when parking demand from the nearby TAFE and school is generally lower. 

    The traffic assessment will also consider parking needs and the impact of the reduction in bays. Options such as dedicated drop-off areas and a bus bay are being explored to help manage parking and traffic around the site.

    Who can I contact if I have questions about the project?

    If you have questions about the project, please see below for the best contact:

    • Construction of the facility: City of Mandurah – 9550 3777
    • Future operation of the facility: City of Mandurah – 9550 3777
    • Site selection, State Government funding or approvals: Department of Creative Industries, Tourism and Sport (DCITS) - communityinfrastructure@cits.wa.gov.au 
    • John Tonkin College, students or school operations: Department of Education
    • South Metropolitan TAFE, students or TAFE operations: South Metropolitan TAFE
    • Department of Training and Workforce Development: TIM.infrastructure@dtwd.wa.gov.au